Wednesday, August 26, 2009

More Staging shots

CaesarStone and Bosch

Roofdeck
Master bedroom
Guest bedroom. Both have full baths.
Roofdeck looking North

The Staging of Unit 2

Ground floor office or third bedroom
Kitchen with the panel of art
Living room shot
A Garage for each unit
Glass wall and removable panel, designed by Eric Black

Wednesday, August 5, 2009

Three toilets, ready to go
Countertops and cabinets in place
Backsplash and gas cooktop
Masterbath shower floor
Stucco complete on first building

Monday, July 6, 2009

Siding


Pouring sidewalks and entry steps
First round of exterior paint
Finishing up siding
Hardi Plank Artisan siding. The white Tyvek with be stucco.

Drywall

Unit 5 drywall

Unpainted Hardi Plank siding
Stair to roof
Drywall stilts

Monday, May 4, 2009

Framing 1

Second floor joists

One week in, starting to take shape.

First walls up

Day three.
Second day of framing, it snowed, in Portland.

Plumbing

Washer and dryer hook up using Pex 
My deep and narrow tubs
Plumbing Prep
$20,000 valve
Everybody hates drainage

Tuesday, April 28, 2009

Site water filtration

Small wetland for roof run off filtration
Dry well for storm water
Dry well
Lots o' cement
Form boards removed

Pouring Foundation

Parking court with poured garages.
Finished pour.
The man in action.
Pouring foundation.

Forming Foundation

Setting form boards
Always useful - Re-Bar
Double checking with engineer.
Compacting before pour.

Sunday, March 8, 2009

Early Site Work - Fall 2008

What was left, after the ReBuilding Center finished deconstruction
The site has been backfilled after excavation and we are ready to start forming.
Beginning to set form boards. Spraying form boards with diesel makes them much easier to clean.